
Americas/Europe0 kW draw
- 6/minHC Valley Battery
EFO01Iao81i7ea9725o08Arknights: Endfield · Power generation (Thermal Bank / batteries)
400 likes on the source, 171,044 views. By snooflo, Americas/Europe, mid game stage.
EFO01893u5E3O61AuUI73
| Code | EFO01893u5E3O61AuUI73 |
|---|---|
| Author | snooflo |
| Region | Americas/Europe |
| Stage | Mid game |
| Topic | Power generation (Thermal Bank / batteries) |
| Footprint | Not published |
| Power | 525 kW draw, 0 kW generated |
| Posted | 2026-01-24 |
| Likes / views | 400 likes / 171,044 views, read 2026-09-20 |
Sandleaf requiered, Sandleaf self sufficient, only resources needed are below. Can switch out the Protocol Stash for one or two Thermal Banks for Energy.
Endfield Tools does not publish a required tech tier or Authority level for a blueprint. If the game refuses to place this layout, unlock the facilities its buildings need first.
The single most-liked plan in the entire pool (400 likes): a pure HC Valley Battery line, the highest tier of Valley power storage. Read 400 likes on 2026-09-20.
From any AIC Area, open the Blueprints Menu (F1 on PC).
In the Blueprints Menu, choose Import Blueprint, in the lower-right of the screen.
Paste the code above exactly as shown, with no extra spaces or line breaks.
Confirm the summary page shows this blueprint, then choose Save to Shared Blueprints.
Open the saved blueprint, choose Place, position it in your AIC, and confirm.